⚠️⚠️⚠️ SERVICE ALERT: Services will have a DELAYED start on Monday, January 26 due to inclement weather. This is to ensure the safety of our customers, our team members, & our community.
Weather permitting, we anticipate returning to normal operations on Tuesday, January 27. We are monitoring the weather and will be update this website as new information becomes available.

Frac Pond Liner Removal

Permitted frac pond liner removal and oilfield site cleanup across Midland, Odessa, and the Permian Basin.

Permian Basin Frac Pond Liner Removal

Since 2013, West Texas Dumpsters has closed out frac ponds and cleaned up oilfield sites across the Permian Basin. We hold the permits to haul the liner and the soil underneath it, which a standard dumpster company cannot legally move.

A frac pond liner is regulated oilfield waste, and most liners and profiled soil fall under the Class 1 or Class 2 non-hazardous special waste we are authorized to haul. That authorization is what separates a clean closure from a problem that resurfaces in an audit.

We take the pit from in-service to bare ground and keep the manifests and profiles in order along the way. For an operator running a tight turnaround, that is one less thing that comes back later.

Built for Active Well Sites

When a frac pond comes out of service, the liner and the soil under it are regulated oilfield waste.

We handle:

  • Pit liner removal and disposal
  • Contaminated soil excavation and hauling
  • Roll-off containers for teardown debris
  • Waste profiling and manifesting under RRC authorization
  • Surface remediation and site reclamation back to bare ground

Permitted to Haul Oilfield Waste

pile of documents sorted by paper clips

Frac pond removal comes down to one thing: whether the hauler is legally cleared to move the waste. We are.

West Texas Dumpsters holds:

  • EPA ID TXR000083663
  • RRC Registration RN109046839
  • IHW Transporter authorization SWR 96263
  • Contaminated Soil Hauling License (Railroad Commission of Texas)
  • PEC-certified operations managers for active site work

Hand a frac pit liner to an unpermitted hauler and the compliance problem stays yours. See all our permits here.

One Call for the Whole Site

Closing a pit usually means juggling a liner crew, a soil hauler, a testing lab, and a disposal site. We run it as one job.

  • Profiling and manifesting handled for you
  • Soil testing partner arranged through us
  • Disposal at Diamondback Landfill, our partner in Odessa
  • Roll-off equipment on rails for access on soft, moist pad ground
  • Container swaps so the teardown keeps moving

How Frac Pond Liner Removal Works

  1. Site survey and quote. Call 800-996-9862. We look at the pit, the access, and the volume, then scope the job.
  2. Clear residual fluid. Any flowback or produced water left in the pit is cleared before the liner comes up.
  3. Liner removal. The liner is pulled and staged for disposal.
  4. Soil testing. If the soil has to move, a TCLP test classifies it. We arrange the testing partner and set up the profile.
  5. Hauling and manifesting. Liner and profiled soil are hauled under RRC authorization, with a signed manifest per load.
  6. Site reclamation. Surface soil is remediated and the pad is returned to bare ground.

Serving the Permian Basin

permian basin aerial overview

We run frac pits and oilfield site work across West Texas oil country:

For well site waste work beyond frac pond, see our Oilfield Waste Disposal services and Contaminated Soil Cleanup.

Get Your Frac Pond Quote

Call 800-996-9862 or contact us online to scope your frac pond liner removal. Tell us where the pad is, how large the pit is, and your timeline, and we will get you a plan and a date.

Working through the closure rules and deadlines first? Start with our Frac Pond Closure Process.

Frequently Asked Questions

What is frac pond liner removal?

It is pulling the synthetic liner out of a frac pond once it is out of service, then cleaning up the pit and the soil around it. Because the liner held flowback or produced water, it is regulated oilfield waste that has to be profiled, manifested, and hauled by a permitted company.

Do I need to test the soil first?

If the soil under the pit has to move, it needs a TCLP test to classify it before disposal. We do not run the lab test, but we arrange the testing partner and set up the waste profile so the job keeps moving.

Where do the liner and soil go?

To a licensed disposal facility under RRC authorization, with a signed manifest for every load. We often dispose at Diamondback Landfill in Odessa, owned by our parent company, so the disposal side stays in house.

What permits does a frac pond removal company need?

Current RRC authorization, plus the credentials for special waste transport. We hold the EPA ID, RRC registration, IHW Transporter authorization, and Contaminated Soil Hauling License. Ask any hauler for those numbers in writing before you sign.

How fast can you get to my site?

Call 800-996-9862 and we will schedule a survey. Timing depends on your location and the size of the pit, and we give you a date when we scope the job.

How much does it cost?

There is no flat rate. Price depends on pit size, liner condition, how much soil moves, and the disposal results. Call 800-996-9862 for a quote built around your site.

Speak with a Waste Professional Today

Ready to get started? Call us at 800-996-9862 for pricing, any questions you may have, and to get your dumpster or porta-potty delivery on schedule. Or simply complete the form below.

This field is for validation purposes and should be left unchanged.
MM slash DD slash YYYY
This field is hidden when viewing the form
Address

West Texas Dumpsters proudly serves

West Texas Dumpsters Phone: 800-996-9862 Address: 4805 W County Road 120 Midland, TX 79706 © 2026 All Rights Reserved.